Request a Quote

Your building receives a roof inspection twice a year. Does that mean it has a maintenance plan?

Only if someone also reviews the findings, approves necessary work and confirms that it has been completed. An inspection can identify a concern, but an unresolved recommendation may remain on the report until the next visit.

A useful commercial roof maintenance plan connects scheduled checks with clear responsibilities. It explains what the contractor will do, what requires separate approval and how your team should report problems between visits.

For Toronto property owners and managers, that makes the plan easier to administer—even when staff, tenants or service contractors change.

What Should a Commercial Roof Maintenance Plan Include? - 1

Begin with a record of the roof you are maintaining

Before agreeing to recurring work, gather the information already available about the building.

Useful records include installation documents, roof plans, previous inspection reports, repair invoices and applicable warranties. GAF’s scheduled maintenance guidance recommends retaining these types of documents together as part of the roof’s records.

If records are incomplete, say so. Do not assign an exact installation date based only on someone’s recollection.

A building may have several roof sections installed at different times. Identify the main roof, additions, lower roofs and any areas with different coverings. A basic marked plan helps everyone use consistent names when reporting a problem.

For example, “north roof beside unit 3” is easier to track than “the area near the air conditioner,” especially when several units are present.

Establish the current condition before setting the schedule

A maintenance agreement should start with an understanding of existing concerns.

Ask whether an initial assessment is included and whether outstanding repairs will be listed separately. This prevents an ongoing plan from being mistaken for confirmation that the roof is already in suitable condition.

The starting record should identify:

  • Known leaks and previous repair locations
  • Accessible roofing and flashing concerns
  • Drainage areas requiring attention
  • Sections that could not be assessed
  • Recommended repairs or further investigation

A commercial roof inspection can provide the findings used to organize that work.

If several concerns are present, request priorities and reasons. The maintenance schedule should not postpone an active problem simply because the next routine visit is months away.

How often should maintenance visits take place?

Set the frequency around the installed roof system, its condition and the building’s circumstances.

Spring and fall visits are a common starting point. GAF’s maintenance checklist recommends inspection at least annually, with twice-yearly inspections described as optimal for the systems addressed by that guidance. It also advises limiting rooftop access to necessary personnel.

Your plan may need additional visits where there is frequent rooftop work, substantial nearby debris, recurring drainage concerns or a history of problems.

Ask what should trigger an assessment outside the normal schedule. Examples to discuss include a reported leak, significant weather damage or work that alters a roof penetration.

The agreement should explain who requests those visits and how they are charged. A scheduled maintenance fee does not automatically include every additional attendance.

Define what happens during each visit

“Roof maintenance” is too broad to describe the work by itself.

Ask for an itemized scope suited to your roof. Depending on the agreement, it may include visual assessment, removal of accessible debris, drainage checks or specified minor maintenance tasks.

Clarify which areas and components are covered:

Plan componentWhat to define
Roof coveringsSections and accessible conditions reviewed
Flashing and penetrationsJunctions, curbs and details included
DrainageOutlets checked and cleaning scope
Debris removalAreas covered and disposal arrangements
Previous repairsLocations reviewed for changes
DocumentationPhotos, findings and recommendations provided

Also ask what is excluded. Internal drainage piping, rooftop equipment servicing, concealed-condition testing and substantial repairs may require separate work.

A clear scope helps you compare proposals and avoids assuming that every concern discovered during a visit will be corrected immediately.

Separate inspection findings from repair authorization

Decide in advance how repair recommendations will become approved work.

Some owners prefer a quote for every repair. Others authorize defined minor tasks within an agreed spending limit. Either arrangement can work if the limits are clear.

Record:

  • Who can approve work
  • Which tasks are included in the maintenance fee
  • Any agreed authorization limit
  • How additional work will be quoted
  • Who should be contacted if the usual approver is unavailable

Avoid an unrestricted instruction to “fix anything you find” without discussing scope and cost.

For commercial roof repair and maintenance, ask that repair recommendations identify the location, proposed method and supporting findings.

After completion, obtain a record of what was done. Approval alone does not establish that the work has been carried out.

Track drainage concerns across visits

Drainage deserves its own record because recurring symptoms can reveal an unresolved issue.

If water repeatedly collects in the same area, keep photographs and observations from successive assessments. Note whether the concern remained after cleaning or repair.

Ask the contractor to distinguish maintenance tasks from changes requiring a separate proposal. Removing debris and correcting a drainage layout are different scopes.

Where internal piping needs assessment, identify who will arrange the appropriate specialist. Otherwise, a recommendation can remain unresolved because each party assumes someone else is handling it.

The next report should refer to the previous finding and explain whether it was corrected, remains present or could not be reassessed.

Coordinate access by other rooftop contractors

HVAC technicians, electricians and other trades may need roof access between maintenance visits. The plan should account for that activity.

Keep a simple access log recording the company, date, work location and purpose of the visit. Tell contractors about approved access routes and any roof-specific restrictions.

GAF notes that equipment servicing can expose roofing to foot traffic outside designated walkway areas, making rooftop activity relevant to inspection and maintenance planning.

For work involving a new penetration, equipment support or alteration, agree on responsibilities before it begins. Establish who designs and completes the roofing connection and who checks the finished detail.

Do not leave a new opening or roof alteration outside the maintenance records. Future inspectors need to know what changed and when.

Workers applying waterproofing on roof

Create a reporting process for tenants and staff

People inside the building may notice a problem before the next roof visit.

Give them a straightforward way to report water entry, ceiling stains or another change. The report should identify the room, approximate location, date and whether the condition is active.

Photos are helpful where they can be taken safely. Staff do not need to diagnose the source or access the roof.

Name a person responsible for receiving reports and contacting the appropriate contractor. Include a backup contact for absences.

A report of water entering near electrical equipment, a bulging ceiling or suspected structural movement needs prompt handling. Staff should keep away from the affected area and seek appropriate urgent assistance rather than waiting for a routine maintenance visit.

Check the actual warranty requirements

A maintenance contract does not automatically preserve every warranty or guarantee.

Review the document applying to your roof. Requirements may address maintenance, records, notifications or the handling of repairs and alterations.

For example, Johns Manville’s published warranty documentation includes requirements to keep roof records and logs of inspections and repairs. Those provisions apply to the relevant warranty, rather than establishing a universal rule for every roof.

Ask who is responsible for checking and following your applicable requirements. If a leak occurs, confirm whether notification must be made to another party before work proceeds.

Avoid assuming that the maintenance contractor has registered a claim or obtained approval unless that responsibility is explicitly included.

Make every report lead to an action record

After each visit, ask for findings that can be tracked.

A practical record includes the location, supporting photos, recommendation, priority and status. It should identify areas that were inaccessible or remain uncertain.

Use a simple action list:

FindingResponsible personCurrent status
Drainage cleaning recommendedProperty managerQuote requested
Localized repair approvedRoofing contractorScheduled
Further investigation requiredOwner’s representativeAssessment being arranged
Completed repairRoofing contractorCompletion photos received

These are example entries, not findings for your building.

Review outstanding items before the next scheduled visit. That keeps the maintenance program moving instead of producing repeated reports with the same unresolved recommendations.

Use maintenance records for future budgeting

Separate recurring maintenance costs from repairs and future replacement planning.

A maintenance plan should help you understand the present condition and outstanding work. It should not promise that the roof will never leak or that replacement can be avoided indefinitely.

If broader work is recommended, ask which findings support it and what additional assessment is needed. For a commercial flat roof, confirm which sections the recommendation covers.

Keep the evidence with your budget records so future decisions are based on the roof’s history rather than a single verbal estimate.

Build a plan your team can manage

For your commercial property in Toronto or surrounding service areas, share the available roof records, known concerns and access requirements with us.

We can assess the current conditions and discuss a maintenance scope, repair priorities and documentation for your building.

Request a free quote from Apple Roofing to plan your commercial roof maintenance.

Frequently Asked Questions